Wiring work
Power and communication cable connection
1. Before wiring work, you must turn off all power source.
2. Indoor unit power should be supplied through the breaker(ELCB or MCCB+ELB) separated by the outdoor power.
ELCB: Earth Leakage Circuit Breaker
MCCB:Molded Case Circuit Breaker
ELB:Earth Leakage Breaker
3. The power cable should be used only copper wires.
4. Connect the power cable{1(L), 2(N)} among the units within maximum length and communication cable(F1, F2) each.
5. Connect V1, V2(for DC12V) and F3, F4(for communication)
when installing the wired remote control.
Outdoor Unit
220-240V~
MCCB+
ELCB
ELB
Indoor Unit 1
ELCB : Essential Installation
WARNING :
Power off before connecting any wires;
Indoor PBA will be damaged while V1,V2,F3,F4 short each
other.
Selecting compressed ring terminal
Norminal
Norminal
dimensions
dimensions
Standard
for cable
for screw
dimension
2
(mm
)
(mm)
(mm)
4
6.6
1.5
4
8
4
6.6
2.5
4
8.5
4
4
9.5
RHF050KHEA_IB,IM_E_32885-3.indd 39
Indoor Unit 2
Silver solder
B
D
Standard
Allowance
Allowance
dimension
dimension
(mm)
(mm)
(mm)
+0.3
±0.2
3.4
-0.2
+0.3
±0.2
4.2
-0.2
+0.3
±0.2
5.6
-0.2
Wired Remote
Control
ERV with DX-COIL
Indoor Unit 4
Ceiling, wall-mounted indoor unit.
d1
E
F
Standard
Allowance
Min.
Min.
(mm)
(mm)
1.7
±0.2
4.1
6
2.3
±0.2
6
6
3.4
±0.2
6
5
EEV kit
L
N
N
L
N
L
N
L
Indoor Unit 5
Indoor Unit 6
L
d2
t
Standard
Allowance
Max.
dimension
Min.
(mm)
(mm)
+0.2
16
4.3
0.7
0
+0.2
17.5
4.3
0.8
0
+0.2
20
4.3
0.9
0
39
2011-10-12 오후 5:30:36