Installation Summary

1. Verify the installation has been properly performed
as outlined by the manufacturer and that it meets
all applicable laws and codes.
2. Test and confirm proper operation of the system as
outlined in the appropriate installation and owner's
manuals.
3. Educate the end–user on the proper operation,
maintenance and service call procedures.
Shutting Generator Down While
Under Load
IMPORTANT NOTE: To turn the generator off during
main power source outages to perform maintenance, or
conserve fuel, follow these steps:
To turn the generator OFF (while running in AUTO and
online):
1. Turn the main power source disconnect OFF.
2. Turn the main line circuit breaker (MLCB) on the
generator to OFF (OPEN).
3. Turn the generator OFF.
To turn the generator back ON:
1. Put the generator back into AUTO and allow to
start and warm–up for a few minutes.
2. Set the MLCB on the generator to ON.
The system will now be operating in automatic mode.
The main power source disconnect can be turned ON
(CLOSED). To shut the unit off, this complete process
must be repeated.
Installation Guidelines for 60 Hz EcoGen™ Generator
Control Panel/Start–Up/Testing