D-Link DGS-1100-08PLV2 Manual page 8

Smart managed switch
Hide thumbs Also See for DGS-1100-08PLV2:
Table of Contents

Advertisement

1 Product Introduction
Per 10/100/1000
Link/Act/Speed
Mbps Port
Per PoE Port
PoE
Light off
Solid Green
Blinking
Green
Green/Amber
Solid Amber
Blinking
Amber
Light off
Solid Green PD is connected and power is supplied.
Green/Amber
Solid Amber
Light off
4
D-Link Smart Managed Switch User Manual
7W, the PoE MAX LED will blink 5
seconds.
When the power budget is using less
than 73W.
Indicates there is a 1000 Mbps
connection on this port.
Indicates data is being processed on
this port at 1000 Mbps.
Indicates there is a 10/100 Mbps
connection on this port.
Indicates data is being processed on
this port at 10/100 Mbps.
Indicates there is no active link on this
port.
PD is connected but failure occured.
The PSE cannot provide power to the
PD due to a PD error or the power
budget is not enough.
No PD is connected.

Advertisement

Table of Contents
loading

Table of Contents