Broan Ultra ZB110H Installation Manual page 6

X2 | multi-speed ventilation fan with humidity sensor
Hide thumbs Also See for Ultra ZB110H:
Table of Contents

Advertisement

Available languages

Available languages

Page 6
New Construction Installation
6
Insert Mask and
Finish Ceiling
• Install ceiling material.
• Cut out around Housing.
CAUTION
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE:
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plug into control assembly.
7
Install Grille
Plug in
1
Sensor
See Page 12 for Operations, Cleaning and Maintenance, and Troubleshooting.
2
ZB110H Installation Guide
Mask protects unit
during construction.
Remove before
installing Grille.
3

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents