Broan Ultra ZB110H Installation Manual

X2 | multi-speed ventilation fan with humidity sensor
Hide thumbs Also See for Ultra ZB110H:
Table of Contents

Advertisement

Available languages

Available languages

READ AND SAVE THESE INSTRUCTIONS
Installer: leave this guide with homeowner.
Register your product online at www.broan.com/register.
Easy installation in both
new construction and retrofit
© 2012 Broan-NuTone LLC
ZB110H
X2 | Multi-Speed
Ventilation Fan
with Humidity Sensor
INSTALLATION GUIDE

Table of Contents

Warnings and Cautions
2
2
3
7
12
12
12
13
13

Advertisement

Chapters

Table of Contents
loading

Summary of Contents for Broan Ultra ZB110H

  • Page 1: Table Of Contents

    ZB110H READ AND SAVE THESE INSTRUCTIONS X2 | Multi-Speed Installer: leave this guide with homeowner. Ventilation Fan Register your product online at www.broan.com/register. with Humidity Sensor INSTALLATION GUIDE Table of Contents Warnings and Cautions Typical Installation New Construction Installation Easy installation in both...
  • Page 2: Typical Installation

    Page 2 ZB110H Installation Guide WARNING CAUTION TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR . For general ventilating use only. Do not use to exhaust INJURY TO PERSONS, OBSERVE THE FOLLOWING: hazardous or explosive materials and vapors. 1. Use this unit only in the manner intended by the manufacturer. 2.
  • Page 3: New Construction Installation

    Page 3 ZB110H Installation Guide New Construction Installation Tools needed Materials needed • Power screwdriver with a Phillips bit • 6" round metal ducting recommended for best performance. Use of other ducting is acceptable but may impact performance. • Phillips screwdriver •...
  • Page 4 Page 4 ZB110H Installation Guide New Construction Installation Snap-in and Secure Housing Position Housing between joists and crimp channel on both sides of Mounting Frame to lock Housing in place. Do not crimp Housing. Screws from Parts Bag Attach Duct Connector and Ducting Top and bottom flanges Screw from go outside Housing...
  • Page 5 Page 5 ZB110H Installation Guide New Construction Installation Connect Wires and Install Knockout Plate • Run 120VAC electrical wiring to the installation location. • Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag. • Connect wires as shown in wiring diagram. Attach cable clamp to Knockout Plate.
  • Page 6 Page 6 ZB110H Installation Guide New Construction Installation Insert Mask and Finish Ceiling • Install ceiling material. • Cut out around Housing. Mask protects unit during construction. CAUTION Remove before installing Grille. IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: If the blower was unplugged, power must be disconnected (see page 2, WARNING item 2) before inserting motor plug into control assembly.
  • Page 7: Retrofit Installation

    Page 7 ZB110H Installation Guide Retrofit Installation Tools needed Materials needed • Power screwdriver with a Phillips bit • Ruler • Tape to seal duct connections • Phillips screwdriver • Pencil • Existing rigid duct will require the addition of a short length of flexible duct •...
  • Page 8 Page 8 ZB110H Installation Guide Retrofit Installation Remove Blower Assembly Set aside Blower Assembly Both sides Remove Wiring Panel Set aside Wiring Panel Set aside screw Insert Mounting Frame Remove screws from Mounting Frame Bend up and set aside four tabs...
  • Page 9 Page 9 ZB110H Installation Guide Retrofit Installation Secure Mounting Frame Screws set aside in Step 7 Snap-in Housing Pull existing wiring into Housing as it is inserted into Mounting Frame Attach Ducting and Duct Connector Screw from Parts Bag Pull existing ductwork into Housing Insert tab into...
  • Page 10 Page 10 ZB110H Installation Guide Retrofit Installation Install Knockout Plate, Connect Wires and Install Wiring Panel • Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag. • Connect wires as shown in wiring diagram. Attach cable clamp to Knockout Plate.
  • Page 11 Page 11 ZB110H Installation Guide Retrofit Installation Insert and Secure Blower Assembly CAUTION IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: Power must be disconnected (see page 2, WARNING item 2) before inserting motor plug into control assembly. Screws from Parts Bag If ceiling repairs are needed, place Mask in Housing after Blower Assembly is secured.
  • Page 12: Operation

    Page 12 ZB110H Installation Guide To Set User-Adjustable Humidity Sensitivity** WARNING Before servicing or cleaning unit, Using a small, flat-blade screwdriver, carefully rotate switch power off at service panel and lock the service HUMIDITY adjustment until arrow points to desired disconnecting means to prevent power from being humidity level shown in percent relative humidity (%RH).
  • Page 13: Troubleshooting

    Page 13 ZB110H Installation Guide Service Parts Troubleshooting Before continuing, turn off power as previously noted in WARNING and CAUTION sections on the previous page. Symptom: Fan does not run. • Check for an open fuse or circuit breaker in building’s service panel.
  • Page 14: Warranty

    Fan or part thereof, to the extent Broan finds it to be covered by and in breach of this limited warranty. Broan will ship the repaired or replaced Fan or replacement parts to you at no charge.
  • Page 15 LEA Y CONSERVE ESTAS INSTRUCCIONES X2 | Ventilador de Aviso al instalador: Deje esta guía con el dueño de la casa. velocidad múltiple con Registre su producto en línea en www.broan.com/register. sensor de humedad GUÍA DE INSTALACIÓN Índice Advertencias y precauciones Instalación típica...
  • Page 16: Instalación Típica

    Página 16 Guía de instalación del ventilador ZB110H ADVERTENCIA PRECAUCIÓN PARA REDUCIR EL RIESGO DE INCENDIOS, DESCARGAS 1. Solo para usarse como medio de ventilación general. No debe usarse ELÉCTRICAS O LESIONES PERSONALES, OBSERVE LAS para la extracción de materiales o vapores peligrosos o explosivos. SIGUIENTES PRECAUCIONES: 2.
  • Page 17: Instalación En Una Construcción Nueva

    Página 17 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Herramientas necesarias Materiales necesarios • Destornillador eléctrico con cabeza Phillips • Se recomienda utilizar conductos metálicos redondos de 6 pulg. (15.2 cm) para obtener un desempeño óptimo. Aunque el uso de otros sistemas •...
  • Page 18 Página 18 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Acople y fije la cubierta Coloque la cubierta entre las vigas y doble el canal a ambos lados del marco de montaje para fijar la cubierta en su lugar. No doble la cubierta.
  • Page 19 Página 19 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Conecte los cables e instale la placa de agujero ciego • Tienda el cable eléctrico de 120 VCA hasta el lugar de la instalación. • Use conectores aprobados por UL para fijar el cableado a la placa de agujero ciego incluida en la bolsa de piezas. •...
  • Page 20 Página 20 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Inserte la cubierta protectora y finalice el cielo raso • Instale el material del cielo raso. • Recorte alrededor de la cubierta. La cubierta protege la unidad durante la PRECAUCIÓN construcción.
  • Page 21: Instalación De Conversión

    Página 21 Guía de instalación del ventilador ZB110H Instalación de conversión Herramientas necesarias Materiales necesarios • Destornillador eléctrico con cabeza Phillips • Regla • Cinta para sellar las conexiones de los conductos • Destornillador Phillips • Lápiz • Los conductos rígidos existentes •...
  • Page 22 Página 22 Guía de instalación del ventilador ZB110H Instalación de conversión Retire el conjunto del ventilador Ponga a un lado el conjunto del ventilador Ambos lados Retire el panel de cableado Ponga a un lado el panel de cableado Ponga a un lado el tornillo Inserte el marco de...
  • Page 23 Página 23 Guía de instalación del ventilador ZB110H Instalación de conversión Sujete el marco de montaje Tornillos extraídos en el paso 7 Encaje la cubierta a presión Tire del cableado existente hacia el interior de la cubierta a medida que lo inserta en el marco de montaje Acople el conector de conductos y los conductos Tornillo de la...
  • Page 24 Página 24 Guía de instalación del ventilador ZB110H Instalación de conversión Instale la placa de agujero ciego, conecte los cables e instale el panel de cableado • Use conectores aprobados por UL para fijar el cableado a la placa de agujero ciego incluida en la bolsa de piezas. •...
  • Page 25 Página 25 Guía de instalación del ventilador ZB110H Instalación de conversión Inserte y fije el conjunto del ventilador PRECAUCIÓN PARA PREVENIR DAÑOS EN EL MOTOR/CONTROL: Debe desconectar la electricidad (vea la página 16, ADVERTENCIA, punto 2) antes de insertar el enchufe del motor en el conjunto de control.
  • Page 26: Funcionamiento

    Página 26 Guía de instalación del ventilador ZB110H Cómo configurar el nivel de sensibilidad a la ADVERTENCIA humedad ajustable por el usuario** Antes de dar servicio a la unidad o de limpiarla, interrumpa el suministro eléctrico Usando un destornillador pequeño de cabeza plana, gire con cuidado en el panel de servicio y bloquee los medios de desconexión el control de ajuste de la humedad hasta que la flecha apunte al nivel del servicio para evitar que la electricidad se reanude...
  • Page 27: Resolución De Problemas

    Página 27 Guía de instalación del ventilador ZB110H Piezas de servicio Resolución de problemas Antes de continuar, desconecte la electricidad, como se señaló en las secciones ADVERTENCIA y PRECAUCIÓN de la página anterior. Síntoma: El ventilador no funciona. • Compruebe si hay un fusible o un interruptor automático abierto en el panel de servicio del edificio.
  • Page 28: Garantía

    Esta garantía cubre sólo el reemplazo o la reparación de los Ventiladores o piezas con defectos del mismo en la plana principal de Broan y no incluye los costos del transporte del servicio en campo ni los gastos de estadía.

Table of Contents