Furuno FAR-2228 Installation Manual page 47

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

Flush mount, fixed at front (for RCU-031)
Note: For flush mounting, select a location where the surface is flat.
1. Make a mounting hole and drill four pilot holes in the mounting location, referring
to the outline drawing at the back of this manual.
2. Attach a ground wire (IV-1.25sq, supplied locally) to the ground terminal at the
bottom of the unit.
*
: Use the screw that is
preattached to the
ground terminal.
3. Set the unit to the mounting hole, then secure the unit with four self-tapping
screws ( 5 20, supplied).
4. Attach four bolt hole caps (supplied).
Bolt hole cap
(4 pcs)
Self tapping screw
(Ø5×20, 4 pcs)
Ground screw*
1. INSTALLATION
Ground wire
1-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents