Mitsubishi Electric EHWT17D-MHEDW Installation Manual page 28

Hide thumbs Also See for EHWT17D-MHEDW:
Table of Contents

Advertisement

5
System Set Up
5.1.2 Connecting inputs/outputs
TBO.1
1
2
1
3
CNP1
4
3
(WH)
5
6
1
1
CNP4
TBO.2
1
3
(RD)
2
SW5
3
4
5
8
1
6
1
CNV1
3
TBO.3
.
1
(WH)
5
SW4
2
3
6
4
1
5
6
7
SW3
8
TBO.4
.
1
8
2
1
3
4
SW2
5
6
7
8
8
1
CNIH
1
(
OG)
3
SW1
1
1
CNBC
CNBHT
(
BK)
3
(GY)
3
8
1
3
CNBH
en
5
(WH)
7
8
7
6
5
4
3
2
1
8
7
6
5
4
3
2
1
8
7
6
TBI.1
TBI.2
TBI.3
<Figure 5.1.2>
Signal inputs
Name Terminal block
IN1
TBI.1 7-8
IN2
TBI.1 5-6
IN3
TBI.1 3-4
IN4
TBI.1 1-2
IN5
TBI.2 7-8
IN6
TBI.2 5-6
IN7
TBI.2 3-4
IN8
TBI.3 7-8
IN9
TBI.3 5-6
IN10
TBI.2 1-2
IN11
TBI.3 3-4
IN12
TBI.3 1-2
INA1
TBI.4 1-3
*1. Set the ON/OFF cycle time of the room thermostat for 10 minutes or more; otherwise the compressor may be damaged.
*2. If using outdoor thermostat for controlling operation of heaters, the lifetime of the heaters and related parts may be reduced.
*3. To turn on the boiler operation, use the main remote controller to select "Boiler" in "External input setting" screen in the service menu.
*4. Connectable electric energy meter and heat meter
● Pulse type
● Pulse duration
● Possible unit of pulse 0.1
Those values can be set by the main remote controller. (Refer to the menu tree in "Main remote controller".)
*5. As for the SG ready, refer to "5.1.6 Smart grid ready".
27
1
CN01
3
(BK)
5
F2
F1
1
CN3C
(BU)
3
LED1
1
CNPWM
(WH)
3
1
CN851
(BK)
8
1
CNRF
(WH)
LED2
5
1
CN105
LED3
(RD)
5
1
CNIT
(BU)
5
CN22
1
1
(BU)
2
SW6
CN108
5
LED4
TAB1
CN1A
CNW5
CNW12
CN21
CN20
(WH)
(BU)
(RD)
(YE)
(RD)
1
1
1
1
1
2
3
4
4
4
5
4
3
2
1
8
7
6
5
4
3
2
1
8
7
6
5
4
3
2
1
8
7
6
5
4
3
2
1
TBI.6
TBI.4
TBI.5
Connector Item
Room thermostat 1 input *1 Refer to SW2-1 in <5.1.1 DIP Switch Functions>.
Flow switch 1 input
Flow switch 2 input (Zone1) Refer to SW3-2 in <5.1.1 DIP Switch Functions>.
Demand control input
Outdoor thermostat input *2 Standard operation
Room thermostat 2 input *1 Refer to SW3-1 in <5.1.1 DIP Switch Functions>.
Flow switch 3 input (Zone2) Refer to SW3-2 in <5.1.1 DIP Switch Functions>.
Electric energy meter 1
Electric energy meter 2
Heat meter
Smart grid ready input
CN1A
Flow sensor
Voltage free contact for 12VDC detection by FTC (TBI.2 1pin ,TBI.3 5 and 7 pins have a positive voltage.)
Minimum ON time: 40ms
Minimum OFF time: 100ms
pulse/kWh
1
pulse/kWh
100 pulse/kWh
1000 pulse/kWh
Wiring specification and local supply parts
Item
Name
Model and specifications
Signal input
Signal input
Use sheathed vinyl coated cord or cable.
function
wire
Max. 30 m
Wire type: CV, CVS or equivalent
Wire size: Stranded wire 0.13 mm² to 0.52 mm²
Switch
Non-voltage "a" contact signals
Remote switch: minimum applicable load 12V DC,
1mA
Note:
Stranded wire should be processed with insulation-covered bar
terminal (DIN46228-4 standard compatible type).
OFF (Open)
Refer to SW2-2 in <5.1.1 DIP Switch Functions>.
Normal
*4
*5
10
pulse/kWh
Solid wire: ø0.4 mm to ø0.8 mm
ON (Short)
Heat source OFF/ Boiler operation *3
Heater operation/ Boiler operation *3

Advertisement

Table of Contents
loading

Table of Contents