Carrier 09AZ091-182 Installation, Start-Up And Service Instructions Manual page 7

Remote air-cooled condensers 90 to 200 tons
Table of Contents

Advertisement

Table 3 — Leg Weight Distribution
SINGLE CIRCUIT
09AZV
091 101 151 171 181 102 112 122 132 142 162 172 182
A
268 302 308 373 377 291 316 302 403 311 308 373 382
B
613 691 462 560 566 665 475 691 605 467 462 560 573
C
268 302 462 560 566 291 475 302 605 467 462 560 573
D
E
268 302 308 373 377 291 316 302 403 311 308 373 382
F
613 691 462 560 566 665 475 691 605 467 462 560 573
G
268 302 462 560 566 291 475 302 605 467 462 560 573
H
Downloaded from
ManualsNet.com
(Single and Dual Circuit Units)
308 373 377
316
308 373 377
316
search engine
DUAL CIRCUIT
403 311 308 373 382
403 311 308 373 382
A. ROTATE UNIT FLAT
1. Gently pull top of unit over, maintaining cable tension as unit is
rotated from vertical to horizontal position.
1/2" LEG BOLTS
Fig. 4 — Unit Rigging
7
HEADER END
A
B
C
D
B. LOWERING LEGS INTO POSITION
1. Reattach lifting hooks into lifting eyes in the perma-
nently attached leg channels. (One set of hooks at
each leg position).
 bolts that hold each leg in
1
2. Remove the four
/
2
telescoped position.
3. Lift unit about 18 so that each leg can drop down
and be reattached with the four bolts removed in
Step 2. Tighten bolts securely.
4. Continue lifting unit to its new home.
E
F
G
H

Advertisement

Table of Contents
loading

Table of Contents