PERIODIC MAINTENANCE AND MINOR REPAIR
1
1
2
2
3
1. Screw (×4)
4
2. Cowling B
2. Remove the screws.
5
6
7
8
9
1
3. Pull the cowling down slightly,
and then pull it outward as
shown.
6-9
1. Tab (×10)
To install the cowling
1. Insert the tabs on the cowling
into the slots as shown, and then
install the screws.
2. Place the floorboard mats in the
original position.
cC
Take care not to damage the tabs
on the cowling when removing and
or installing it.
1
ECA00067