System Dump And Fill, Connect To Equipment - Pentair EVERPURE EZ-RO 200/2G Installation & Operation Manual

Table of Contents

Advertisement

SYSTEM DUMP AND FILL, CONNECT TO EQUIPMENT

1. After 24 hours, stop system flush by closing outlet
valve: Rotate 90 degrees so that it points to the right.
2. Open tank valve, this will allow water from the tank to
enter RO processor.
IMPORTANT: Water flow can be very high (5 to 6 GPM).
Make sure outlet tube is secure and running to drain.
TANK DUMP AND FILL
3. DUMP: Slowly rotate to open outlet valve until it is
pointing up to drain tank water.
4. Allow tank to empty. When the flow rate from the opti-
mized outlet tube significantly drops, the tank is empty.
5. FILL: When the tank is empty, close the outlet valve
of system to allow tank to fill by rotating valve until
pointing to right.
• Optimized water will begin to fill tank again.
• Water will be flowing from the reject line based on
the flow restrictor your system uses.
6. Repeat steps 3–5 for a total of five dumps and fills.
CONNECT TO EQUIPMENT
7. Attach garden hose fitting to ½" hose.
a. Separate the hose barb adapter into three parts:
threaded fitting, barbed flange, gasket. Slide band
clamp onto hose first and threaded fitting second.
b. Insert barbed flange into hose.
c. Push until edge of flange is flush with hose tip.
d. Insert gasket into threaded fitting.
e. Slide band clamp to end of hose and tighten screw.
8. Connect garden hose to equipment.
9. Open outlet valve on RO processor until it is pointing
up to allow optimized water to enter equipment.
• Water will begin to enter equipment.
• Complete final check for leaks.
System install and flushing complete.
Treated water is now in use at equipment.
NOTE: The tubing/piping and associated fittings
connecting the RO water outlet to the equipment being
serviced should be food-grade material that meets NSF® Standard 51, 61, or similar,
with a minimum pressure rating of 100 psi (6.9 bar, 0.69 MPa). The RO water may
react with metal piping, creating a corrosive condition in addition to imparting an
objectionable taste. Plastic pipe or reinforced beverage tubing are generally very good
material choices for RO water distribution piping. The size of the water tubing/piping
should be 1/2-inch (12.7 mm) O.D. minimum.
14 | PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE
1
3
5
8
9
open
open
2
WAIT
4
1. 1.
Empty, Fill
Empty, Fill
2. 2.
Empty, Fill
Empty, Fill
3. 3.
Empty, Fill
Empty, Fill
4. 4.
Empty, Fill
Empty, Fill
6
5. 5.
Empty, Fill
Empty, Fill
7
B A
B
C
D
E
FOODSERVICE.PENTAIR.COM

Advertisement

Table of Contents
loading

Table of Contents