GAS BOOSTING
The installation of the Manifold Pack or Demand Duo must be carried out in accordance with instructions supplied
with the system. Piping connections to the Solar Preheat must be carried out as shown on the following pages.
The temperature setting of the gas boosters must comply with plumbing regulations
SOLAR PREHEAT WITH MANIFOLD PACK
Rinnai
31
EVT DD Solar Pre Heat System Operation and Installation Manual