INSTALLATION - EVACUATED TUBES
ASSEMBLY INSTRUCTIONS
Assemble Base Frame
Step 1. Place the manifold header and the bottom
support assembly upside down. Place the
three Base Frame Rail A as shown in the
diagram.
Step 3. Fasten the rails to the bottom support
assembly using the M8 nuts and bolts
supplied.
Step 5. Fasten using the M6 nuts and bolts supplied.
Rinnai
Step 2. Fasten the rails to the header using the nuts
supplied with the header.
Step 4. Position the two Base Frame B rails under
the existing components
Step 6. Turn assembly up correct way
18
EVT DD Solar Pre Heat System Operation and Installation Manual