Panasonic NV-SJ4140PN Service Manual page 34

Video cassette recorder
Table of Contents

Advertisement

5.2.12.1. Reassembly Notes
1. Installation/Alignment of Intermediate Gear A, Lift Gear and P5
Arm Unit
A. Rotate the Lift Gear so that Hole A on Lift Gear is a Through
Hole with a hole on chassis.
B. Install the Intermediate Gear A so that the hole on Intermediate
Gear A is aligned with the hole on Lift Gear.
C. Install the P5 Arm Unit so that it contacts with the tab of
chassis.
2. Installation of Opener Piece
A. Install the Opener Piece so that the slot of the Opener Piece is
inserted to the Pin of Pinch Arm Unit
5.2.13. Motor Block Unit, Audio Control Head Unit, Lift Gear, Tension Arm Boss,
and Cleaner Arm Unit
Fig. J10-2
Fig. J10-3
Fig. J11
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nv-fj6140pn

Table of Contents