7.1.3
Non operation Thermal Shock
Item
Temperature
Reset cycles times
Total cycles
7.1.4
Package Drop
Drop height (Select drop height according to the gross weight refer to the table at below)
Gross Weight(kg)
Drop Height(cm)
Drop sequence and orientation
Drop
Step 1
Corner(2-3-5)of package
Step 2
Edge(3-5)
Step 3
Edge(2-3)
Step 4
Edge(2-5)
Step 5
Face(bottom-3)of package
Step 6
Face(left-4) of package
Step 7
Face(front-5) of package
Step 8
Face(right-2) of package
Step 9
Face(rear-6) of package
Step 10
Face(Top-1) of package
Mechanical and electrical damage should not exist after vibration test, and shall be submitted for approval customer before
mass production.
8. Marking and Identification
8.1 S/N Label
The approval marking is required by the countries of sales destination.
8.2 Carton label
The approval marking is required by the countries of sales destination.
Test
25
ºC
3cycles ,
Drop onto
Type Drop
Corner
of package
of package
of package
Description
0
-20
C to 60
>60
(10hrs)>25
(2hrs)>-20
ºC
ºC
every transition time 0.5 hr,
3 cycles
1.0<W≦9.0
76
Edge
Edge
Edge
Flat
Flat
Flat
Flat
Flat
Flat