Sampling Period And Control Output Period - Mitsubishi Electric MELSEC Q Series User Manual

Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

3 SPECIFICATIONS

3.3 Sampling Period and Control Output Period

3 - 24
Downloaded from
ManualsNet.com
(1) Sampling period
(a) The Q64TC performs PID operations in order of CH1, CH2, CH3, CH4, CH1,
CH2 .....
The time from when PID operation is started on the current channel (CHn)
until PID operation is restarted on the current channel (CHn) is called a
sampling period.
(b) The sampling period is 0.5 seconds regardless of the number of channels
used.
Since other processings (such as error check) are also performed on unused
channels, the sampling period will not change if you make unused channel
setting.
CH1 PID
operation
(2) Control output period
(a) The control output period indicates the ON/OFF cycle of transistor output.
Transistor output
The manipulated value (MV) represents the ON time of this control output
period as a percentage. (Refer to Section 3.5.6)
(b) Set the control output period to Control output period setting (buffer memory
address: 2F
search engine
CH2 PID
CH3 PID
CH4 PID
operation
operation
operation
0.5 seconds (sampling period)
0.5 seconds (sampling period)
OFF
ON
Control output period
, 4F
, 6F
, 8F
) in the range 1 to 100s.
H
H
H
H
MELSEC-Q
CH1 PID
CH2 PID
operation
operation
OFF
ON
Control output period
3 - 24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q64tcttQ64tcttbwQ64tcrtQ64tcrtbw

Table of Contents