(1) Prepare a polyvinyl chloride pipe with a 1-1/4 in. (32mm) outer diameter.
(2) Fasten the tubing to drain hose with the adhesive agent and factory-supplied clamp.
The drain piping must be performed with a down-slope pitch of 1/25 to 1/100.
Hose Band
Drain Pipe
(Accessory)
Connection
5/8 in.
(15mm)
* The total length of a+b+c :
a≤12 in. (300mm),b≤33-1/2 in. (850mm),c≤2 in. (50mm), a+b+c≤43-5/16 in. (1100mm)
* In case of lifting the drain pipe at outlet part, perform the drain piping work as shown in the above figure.
(3) Insulate the drain pipe after connecting the drain hose.
Hose Band (Accessory)
Hose Band
(Accessory)
1/25 to 1/100
Down-Slope
Drain House
(Accessory)
Vinyl Chloride
(Field Supplied)
Drain House
(Accessory)
Packing [3/16 T
x11x11
(5Tx270x270)]
(Accessory)
Installation and Maintenance
Upward Slope
Unit
1/25 to 1/100 Down-Slope
Common Drain Piping
This drain pipe shall be
separating from other pipes
Unit: in. (mm)
15
Rising part
Drain Pipe
Connection