Amana MEC96 Series Manual page 14

Two-stage gas furnaces
Hide thumbs Also See for MEC96 Series:
Table of Contents

Advertisement

*MEC96/*CEC96 Direct Vent (2 - Pipe) and Non-Direct Vent (1- Pipe)
Pipe Size
MODEL
(in.)
*M EC960303AN
2
&
*M EC960403AN
3
2
*M EC960603AN
3
*M EC960302BN
2
&
*M EC960402BN
3
2
*M EC960603BN^
3
2
*M EC960803BN
3
2
*M EC960804CN
3
2
3
2
*M EC961005CN
3
*M EC961205DN
3
2
*CEC960403BN
3
2
*CEC960603BN
3
2
*CEC960803BN
3
2
*CEC961005CN
3
^ *MEC960603BN-add 45' of 2" pipe for upflow.
Figure 11
Maximum Allowable Length of Vent/Flue Pipe
1
2
3
75
70
65
114
107
100
75
70
65
114
107
100
100
95
90
168
161
154
50
45
40
143
136
129
60
55
50
113
106
99
60
55
50
120
113
106
45
40
35
103
96
89
45
40
35
151
144
137
185
178
171
100
95
90
110
103
96
45
40
35
110
103
96
35
30
25
103
96
89
45
40
35
110
103
96
14
Number of Elbows
4
5
60
55
93
86
60
55
93
86
85
80
147
140
35
30
122
115
45
40
92
85
45
40
99
92
30
25
82
75
30
25
130
123
164
157
85
80
89
82
30
25
89
82
20
15
82
75
30
25
89
82
The rubber elbow is not designed to support a load. When
the rubber elbow is mounted externally to the furnace
cabinet, extreme care must be taken to adequately support
field-supplied vent/flue piping, as damage can result in leaks
causing bodily injury or death due to exposure to flue gases,
including carbon monoxide.
6
7
8
50
45
40
79
72
65
50
45
40
79
72
65
75
70
65
133
126
119
25
20
15
108
101
94
35
30
25
78
71
64
35
30
25
85
78
71
20
15
10
68
61
54
20
15
10
116
109
102
150
143
136
75
70
65
75
68
61
20
15
10
75
68
61
10
5
NA
68
61
54
20
15
10
75
68
61
WARNING

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cec96 series

Table of Contents