VENTING MATERIAL REQUIREMENTS
PVC
SCHEDULE 40 PIPE
SCHEDULE 40 CELLULAR CORE PIPE
SDR 21 OR 26 PIPE
FITTINGS
ABS
SCHEDULE 40 PIPE
SCHEDULE 40 CELLULAR CORE PIPE
FITTINGS
CPVC
SCHEDULE 40 PIPE
SDR 21 OR 26 PIPE
FITTINGS
POLYPROPYLENE
INNOFLUE® (CENTROTHERM)
POLYPRO® (DURAVENT)
PRIMER & SOLVENT CEMENT
PVC PRIMER
CPVC PRIMER
PVC SOLVENT CEMENT
CPVC SOLVENT CEMENT
ABS SOLVENT CEMENT
ABS / PVC / CPVC ALL PURPOSE CEMENT (FOR PIPE & 
FITTINGS OF THE SAME MATERIAL)
TRANSITION CEMENT FOR ABS TO PVC or CPVC
INSTALLATIONS IN CANADA
PVC & CPVC PIPE & FITTINGS
PVC & CPVC SOLVENT CEMENT
TRANSITION CEMENT
INNOFLUE® (CENTROTHERM)
POLYPRO® (DURAVENT)
Upon completion of the furnace installation, carefully
inspect the entire flue system both inside and outside of the
furnace to assure it is properly sealed. Leaks in the flue
system can result in serious personal injury or death due to
exposure to flue products, including carbon monoxide.
Failure to follow these instructions can result in bodily
injury or death. Carefully read and follow all instructions
given in this section.
ASTM STANDARD
D1785
F891
D2241
D2466
D1527
F628
D2468
F441
F442
F438
F656
F656
D2564
F493
D2235
D2564, D2235, F493
D3188
ULC S636
WARNING
WARNING
To avoid bodily injury, fire or explosion, solvent cements
must be kept away from all ignition sources (i.e., sparks, open
flames, and excessive heat) as they are combustible liquids.
Avoid breathing cement vapors or contact with skin and/or
eyes.
ACCEPTABLE
12
WARNING
PREFERRED
Figure 4
TRANSITION NO LESS
THAN 45 DEGREES TO
HORIZONTAL PLANE TO
AVOID CREATING A WATER
TRAP IN VENT PIPING.
Figure 5
NO TRANSITION ON
HORIZONTAL PLANE,
THIS CREATES A
WATER TRAP AND
RESTRICTS FLUE
GASES
Figure 6