7.2.11. Setting the PAD PCB
1. Fix the PAD PCB using the 2 Screws. <N29>
2. Attach the TP PCB Screw Sheet.
3. Connect the Cable to the Connector. (CN802)
4. Connect the Cable to the Connector (CN801) and attach
the Tape.
Screws <N29>: DRQT26+E3FNL
■ Assembly of PAD PCB
* Notes:
1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2
S1:Insulation S2:Pinching Cables S3:Sharp Edge
CAUTION
S4:Part No. Check S5:Others
Safety Working
Attach the Touch Pad INS Sheet
Avoid running over the boss and the rib.
0 2
Process the surplus
LED PCB
of FFC to the back.
Cable Hold Sheet
is installed
Safety Working
S1
Attach the Tape
Fit to the Cabinet line.
Safety Working
Safety Working
Attach the Tape
Fit to the Cabinet line.
PCB Pad
Process the wire targeting the boss.
TP PCB Screw Sheet
Tape
Connector
(CN801)
Pad PCB
Order of fixing
Screw
Screw
Insert the boss at an angle to put here close to the Cabinet side.
Process the SP cable between the bosses.
FFC Insertion
PCB Pad is set
S2
Tighten of
Screw
Tighten of
Screw
7 11
S2
S2
7 11
CN Connection After connecting, add the kapton tape.
7-24
<N29>
<N29>
Connector
(CN802)
Safety Working
Attach the Touch Pad
S1
PCB Screw Sheet
Do not insert the Connector at an angle.
0 2
FFC Insertion
Attach the Touch
Pad FFC Fix Tape
0 2
0 2
Attach the
Cable Sheet