■ Assembly of Power SW
* Notes:
1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2
Tighten of Screw
FPC Power SW is set
Power SW LED
Panel is set
Attach the Battery Cushion
Battery Pack Insertion Slot
Attach the Battery Slide Sheet (on Battery Cushion)
Avoid air leaking into it. Avoid coming off 4 corners.
Fit to the line.
10 1
Attach the DC Gasket
Ensure the upper and lower Flex holes match.
S1:Insulation S2:Pinching Cables S3:Sharp Edge
CAUTION
S4:Part No. Check S5:Others
7-18
Top
Bottom
12 2
25 2
Connection Direction
Cable Power
Connection
CAB Wall
Connection Direction
S3
Safety Working
Attach the TP
FPC Tape
Match the Cabinet slit
and the tape slit.
Do not run the Cabinet
edge out of the tape slit.