Suggested Tool Requirements - Quasar HQ-2243TH Installation And Operating Instructions Manual

Panasonic room air conditioner operating instructions hq-2243th
Table of Contents

Advertisement

Available languages

Available languages

Suggested Tool Requirements

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet at
both sides and at the back.
2. Slide the unit out from the cabinet by gripping the
base pan handle and pulling forward while
bracing the cabinet.
3. Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-PE to the
underside of the window sash.
4. Remove the backing from Foam-PE with 3 holes
and attach it to the bottom of the Top retainer bar.
5. Attach the Top retainer bar on the top of the
cabinet with 3 screws (Type A).
6. Insert the Frame guides into the bottom of the
cabinet.
7. Insert the Frame Curtain into the Top retainer bar
and Frame guides.
8. Fasten the curtains to the unit with 10 screws
(Type A) at both sides.
Foam-PE
Top retainer bar
Screw
(Type A)
11
Shipping screws
Fig. 1
Fig. 2
Top retainer bar
Foam-PE
Fig. 3
Screw(Type A)
Frame guide
Fig. 4

Advertisement

Chapters

Table of Contents
loading

Table of Contents