Section 300~Installation
G ro unding
Guidelines
Installation
Figure 3-4.
DBS-70-300
Technical Manuals Online! - http://www.tech-man.com
Before grounding the DBS, read the "Lightning Protection/Grounding"
l
requirements beginning on page l-6.
The ground cable must be at least 18 AWG.
l
Resistance to ground must be 10 Ohms or less.
l
1. Attach the ground cable to the ground screw on the front of the power
2. Connect the ground cable to the building ground.
.
DBS Manual - Issued 8/l/95
Chapter 3. Cabinet Installation
3-5