Assembly Process - Panasonic ET-DFD95 Installation Instructions Manual

Dual stacking mount bracket (for dlp based projectors)
Table of Contents

Advertisement

Assembly process

Follow the steps below to assemble this product and install the DLP (TM) Projectors.
1. Assemble the left and right frames.
2. Mount the lower projector in the base frame.
3. Attach the gas springs to the left and right frames.
4. Attach the upper projector to the upper frame.
5. Attach the upper frame and upper projector to the left and right frames and gas springs.
6. Attach the left and right guard frames.
Assembly
1. Attach the left and right frames to the base frame.
[1] Attach the left and right frames to the base frame. Although the base frame has no specified front or back,
take care to ensure that the left and right frames are positioned correctly. The connection hole near the top
of the left and right frames indicates the back.
Fix the frames in place using the built-in allen hex socket bolts (M6x20, with flat washer and spring washer),
and allen hex socket bolts (M8x50, with flat washer and spring washer).
Note:When assembling this unit, adjust the stoppers (four) on the base frame to stabilise the base frame.
allen hex socket bolts(M8x50)
Left frame
Base frame
Hex nut
Stopper
After adjusting the stoppers,
move the hex nuts upward
to lock the base frame in place.
9
Built-in allen hex socket bolts(M6x20,
with flat washer and spring washer)
Base frame
Front
Right frame
Upper frame connection hole
allen hex socket bolts(M8x50)
9

Advertisement

Table of Contents
loading

Table of Contents