No
Parts
12
Tube Parts
(Assy Tube Suction,
Assy Tube Discharge,
Assy Tube EEV)
1) Loosen 4 bolts fixed to assemble Valve
2) Disassemble the serevel pipe with welding
3-30
All manuals and user guides at all-guides.com
Procedure
1. Remove the refrigerant surely before pipe
disassembly.
2. Disassemble EEV Coil before work when
you replace EEV.
3. Please weld after wrapping head with a
towel and others so that EEV head is not
heated, when you replace EEV.
Service with Bracket Valve.
torch.
Remark
Samsung Electronics