Carrier EVERGREEN 19XR Installation And Start-Up Instructions Manual page 3

Evervu touch screen display for evergreen 19xr,xrv, 23xrv chillers with pic ii or pic iii controls
Hide thumbs Also See for EVERGREEN 19XR:
Table of Contents

Advertisement

1. Slide the screen display onto the mounting bracket.
(location shown in Fig. 3).
a19-1892
Fig. 3 — Display Screen Mounting Location
2. Two hooks secure the display screen to the mounting
bracket. Hold the display screen until verifying that the
display screen is supported by the hooks on the mounting
bracket before releasing. See Fig. 4.
IMPORTANT: To prevent damage to display screen,
do not mount the display on the arm until arm is com-
pletely attached to the tube sheet.
DISPLAY
a19-1893
MOUNT
Fig. 4 — Bolt Display Screen to Arm
3. The display height is adjustable within a 15.9 in. range.
Arm dimensions are shown in Fig. 5.
4. Using a hex screwdriver, secure the arm from pulling out
of the mount by tightening the hex screw on the side of
the mount. The display screen can now be positioned to
desired height. To adjust tension on the up and down
movement of the arm, tighten the hex screw on the top of
the arm mount (Fig. 6).
MOUNTING
BRACKET
MOUNTING
BRACKET
RETAINING
BOLT
3.1"
6.7"
MAX
HORIZONTAL
RANGE
24.1"
13.3"
5.6"
Fig. 5 — Display Arm Dimensions
ARM
a19-
1891
Fig. 6 — Adjust Arm Tension
3
3.5"
15.3"
MAX
VERTICAL
RANGE
15.9"
7.1"
a19-1894
HEX SCREW TO
ADJUST ARM
TENSION
HEX SCREW
TO SECURE
ARM TO ARM
BASE