Installation; Installation Requirements; General Operating Conditions; Transport - Miele PDR 914 Operating And Installation Instructions

Commercial tumble dryers
Table of Contents

Advertisement

Installation

30

Installation requirements

The tumble dryer must only be installed and commissioned by
Miele Service or an authorized dealer.
The tumble dryer should be installed in accordance with all rele-
vant regulations and standards.
The dryer must only be operated in a room that has sufficient venti-
lation and which is frost-free.

General operating conditions

This dryer is intended only for use in a commercial environment and
must only be operated indoors.
Do not install the tumble dryer in a room where there is a risk of frost.
Depending on the nature of the installation site, sound emissions and
vibration may occur.
Tip: Have the installation site inspected and seek the advice of a pro-
fessional in instances where increased noise may cause a nuisance.

Transport

The tumble dryer must not be transported without a transport pal-
let.
Suitable transport aids must always be used during transportation.
At the installation site, the tumble dryer must be lifted from the trans-
port pallet using suitable lifting gear.

Installing the tumble dryer

Place the tumble dryer on a perfectly level, secure, and horizontal
surface that is able to withstand the specified floor load.
The floor load created by the tumble dryer is concentrated and
transferred to the installation surface via the screw feet. A base is
not required. However, an uneven floor surface must be compen-
sated for.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 918Pdr 922Pdr 928Pdr 944

Table of Contents