Assembling The Roof Frame - Harbor Freight Tools 93920 Assembly Instructions Manual

Harbor freight tools 8' x 10' greenhouse with two vents assembly instructions
Table of Contents

Advertisement

At this point, the completed section of the frame will likely need support. Attach the
second Ceiling Plate the same way.
8.
Attach a Corner Bracket (26) at the top of each Corner Stud (1) so that the bracket
faces upwards, see diagram to the right. Leave the bottom holes of the two rear
Corner Brackets (26) empty to allow the rear brace to be attached to those holes
in the next step.
9.
Attach the Rear Brace (23) to the
the Rear Floor Plate (16). Attach each end to the lower hole on the Corner Bracket
(26) using a Long Bolt (60) and Nut (61). (See Figure A.)
4
1.
At the side of the Greenhouse: Assemble the Front Crown (15a) to the Rear Crown
(15b) using the attached bracket.
2.
Attach the Front-Right and Front-Left Crown Beams (2,
3) to the outside of the Crown Ass'y (15) with the angled
edges towards the top. See diagram to the right, viewed
from under the Crown, facing forward.
3.
Attach the Top Doorway Beam (14) and Door Rail (28)
assembly to the outside (opposite the Crown) of the Front-
Right and Front-Left Crown Beams (2, 3).
4.
Attach the Front-Center Top Stud (13) to the center of the Top Doorway Beam (14).
For technical questions, please call 1-800-444-3353.
SKU 93920
inside of the two Corner Brackets (1) that are over

Assembling the Roof Frame

5
15b
Figure b
15a
2
13
3
39
14
15
28
3
2
Page 8

Advertisement

Table of Contents
loading

Table of Contents