Frame Assembly; Assembling The Outer Frame - Harbor Freight Tools 93920 Assembly Instructions Manual

Harbor freight tools 8' x 10' greenhouse with two vents assembly instructions
Table of Contents

Advertisement

Unless noted otherwise, all frame parts will be attached using the Short
bolts (59) and Nuts (61) provided. bolts should all be assembled with their
heads facing the outside of the greenhouse. tighten Nuts only about
turn past finger-tight; be careful not to overtighten.
lay out all parts by number prior to assembly.
An assistant or an appropriate support (not included) will be useful to keep
the partially assembled parts upright during assembly. two assistants should
be used to assemble the crown pieces to the rest of the frame.
Assemble on a clear, calm day. Wind may damage the Greenhouse and will
make assembly difficult.
Gravel
ground
1.
Use the bracket built into Side Floor Plate A (18a) to attach Side Floor Plate B (18b).
Repeat for the second pair of Side Floor Plates. Lay all Floor Plates (16-18b) out
on top of the base with the flanges facing the outside of the greenhouse as shown
above. Make sure that the Front Floor Plate (17) is on the side that you want your
door to be located.
2.
There are four Corner Studs (1) to be attached to the Floor Plates (16-18b), the end
with two holes should be at the bottom. Attach one Corner Stud (1) on the outside
of each corner using two Bolts. As shown above: 1) slide a Hold Down Connector
For technical questions, please call 1-800-444-3353.
SKU 93920

FRAmE ASSEmbly

Front Floor
Plate (17)
outside
greenhouse
Base
(40)
cross Section

Assembling the Outer Frame

1
1
44
Gravel
ground
2
2
59
61
44
1
Rear/Side Floor
Plates (16,18a, 18b)
outside
greenhouse
Base
(40, 41a, 41b)
Page 6
/
4

Advertisement

Table of Contents
loading

Table of Contents