11. Checking for major P.C.Bs
Note:
Checking of all major P.C.Bs (Main P.C.B., Panel P.C.B., Transformer P.C.B., Deck P.C.B., Deck
Mechanism P.C.B., Sub- Power P.C.B. and Power P.C.B.) can be carried out using below
procedures.
For the disassembling procedures, refer to Section 10.
11.1. Checking of Main P.C.B.
1. Remove Top Cabinet and Rear Panel.
2. Remove CD Lid.
3. Disassemble CD Mechanism Unit.
4. Connect FFC wires (CN2801 & CN2805) from CD Mechanism Unit.
11.2. Checking of Transformer P.C.B.
1. Remove Top Cabinet and Rear Panel.
2. Remove CD Lid.
62
PDF created with pdfFactory Pro trial version
www.pdffactory.com