Back Cover Assy.(0-A201) - Pentax MZ-S Service Manual

Hide thumbs Also See for MZ-S:
Table of Contents

Advertisement

7.Back cover (0- - - - A201)
7.Back cover (0
7.Back cover (0
7.Back cover (0
[Assembly procedures
[Assembly procedures
[Assembly procedures
[Assembly procedures
7 7 7 7 - - - - 1. Assembly of A238 and related parts.
1. Assembly of A238 and related parts.
1. Assembly of A238 and related parts.
1. Assembly of A238 and related parts.
1) A271(Date module)・A268, 1 screw.
2) A245,A247, 1 screw.
3) Install 5 parts for Data imprinting.
(Make sure No hair, No stain exist)
A283
A280
4) Set 0-A290・A285 and install with A287・・・2 screws.
5) A240・A241 (x11),0-A290,A265, 3 screws.
6) Solder 5 points.( → )
7) Adhere A267 x2 to the both sides of Button SW land.
7 7 7 7 - - - - 2. Assembly of A238
2. Assembly of A238
2. Assembly of A238
2. Assembly of A238
1) Wipe off 4 lands with mixed chemicals for cleaning.
2) A263・A264(AF button・SW),A242(Date button)
3) A238(Back cover base plate),A189(Cover retainer screw i) x4
4) A223(Cartridge retainer spring), 2 screws(Ni)
5) A225(Light seal) x2・・・adhere securely.
6) A272(Battery for date),A232(Battery cover),A255(Batt. cover retainer screw).
7) ApplyL115・・・key board, Installing position of A211(6).
8) A211(Roller) x2・・・ The longer shaft side should face inside.
9) 0-A202(Pressure plate assy.)
For checking LED of Data imprinting,
Please refer to「1-13.[Check]
A201)
A201)
A201)
] ] ] ]
A281
A284
A282
.[Check]」.
.[Check]
.[Check]
27640 -26/34-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents