Replacing The Cpu Enclosure (Bottom) - Emerson FB2100 Field Replacement Manual

Flow computer cpu enclosure and electronics
Hide thumbs Also See for FB2100:
Table of Contents

Advertisement

FB2100/FB2200 Flow Computer CPU Enclosure & Electronics Field Replacement Guide

Replacing the CPU Enclosure (Bottom)

1.
Slide the connectivity board into the bottom of the new CPU enclosure. The Ethernet port must
fit into its matching opening on the side of the enclosure.
2.
If present, replace the optional 6-channel expansion I/O board. See
Expansion I/O Board
3.
Replace the CPU board. See
4.
Reattach the adapter board. See
5.
Reattach the CPU enclosure cover. See
6.
Re-attach the CPU enclosure to the battery compartment.
the Battery Compartment
7.
Re-connect the cable between the CPU enclosure and the sensor module.
8.
Reattach the HMI module. See
on page 18.
Replacing the CPU Board
Replacing the Adapter Board
Replacing the CPU Enclosure Cover (Top)
on page 9.
Replacing the HMI Module
Replacing the 6-Channel
on page 16.
on page 14.
See Re-attaching the CPU Enclosure to
on page 6.
D301803X012
November 2020
on page 11.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fb2200

Table of Contents