FB2100/FB2200 Flow Computer CPU Enclosure & Electronics Field Replacement Guide
Replacing the Connectivity Board
1.
Slide the connectivity board into the bottom of the CPU enclosure. The Ethernet port must fit
into its matching opening on the side of the enclosure.
2.
If present, replace the optional 6-channel expansion I/O board. See
Expansion I/O Board
3.
Replace the CPU board. See
4.
Reattach the adapter board. See
5.
Reattach the CPU enclosure cover. See
6.
Re-attach the CPU enclosure to the battery compartment. See
the Battery Compartment
7.
Re-connect the cable between the CPU enclosure and the sensor module.
8.
Reattach the HMI module. See
Removing/Replacing the CPU Enclosure (Bottom)
UL Listed Enclosure Box (Bottom) Field Installed Accessory Kit for Use in Class I, Division 2, Groups A,
B, C, D
on page 18.
Replacing the CPU Board
Replacing the Adapter Board
Replacing the CPU Enclosure Cover (Top)
on page 9.
Replacing the HMI Module
Replacing the 6-Channel
on page16.
on page 14.
Re-attaching the CPU Enclosure to
on page 6.
D301803X012
November 2020
on page 11.
21