CHECKLISTS

1 PRE-TEST CHECKLIST

Remove all protective film, if present, and any
A
stickers.
Check to be sure that all wiring is secure and
B
not pinched or in contact with moving parts.
Check level of appliance.
C
D Check that the cooktop is properly grounded.
Installation Instructions
8

2 OPERATION CHECKLIST

Remove all items from the top of the cooktop
A
surface.
Turn on the power to the cooktop.(Refer to
B
your Owner's Manual.) Verify that all surface
burners operate properly.
Check that the circuit breaker is not tripped
C
nor the house fuse blown.
D Check that conduit is securely connected to
the junction box.
See Owner's Manual for troubleshooting list.
E
NOTE TO ELECTRICIAN:
The power leads supplied with this appliance are
UL recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than
the temperature rating of household wiring.
The current carrying capacity of a conductor
is governed by the wire gauge and also the
temperature rating of the insulation around the
wire.
NOTE: ALUMINUM WIRINg
• WARNINg:
IMPROPER CONNECTION Of ALUMINUM
HOUSE WIRINg TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEM.
• Splice copper wires to aluminum wiring
using special connectors designed and UL
approved for joining copper to aluminum
and follow the manufacturer's recommended
connector procedure closely.
NOTE: Wire used, location and enclosure of
splices, etc., must conform to good wiring
practice and local codes.