Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
1. Commissioning the system............................................................................................... 10
•
•
2. Shutting down the system................................................................................................. 10
•
•
3. Opening the boiler door and cleaning cover................................................................... 11
•
4. Cleaning the internal pipes, heating surface, flue outlet and flue pipe........................ 11
•
•
5. Checking all gaskets and packing cords on the flue gas side
•
•
6. Checking the thermal insulation components on the boiler door................................. 12
•
7. Inserting internal pipes; securing the boiler door and cleaning cover......................... 13
•
•
8. Checking connections and sensor well on the heating water side for tightness
•
•
9. Checking the function of safety equipment..................................................................... 13
•
•
•
10. Checking the function of the pressure switch................................................................ 14
•
•
11. Checking the expansion vessel and system pressure................................................... 14
•
12. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 15
•
•
13. Checking the firm seating of electrical plug-in connections and cable grommets
•
•
14. Checking the thermal insulation
•
•
15. Checking the water quality................................................................................................ 15
•
•
16. Cleaning the sight glass in the boiler door...................................................................... 15
•
17. Checking the mixer for ease of operation and tightness............................................... 15
•
18. Checking the function of the return temperature raising facility (if installed)
•
•
19. Checking the installation room ventilation
•
•
20. Checking the flue pipe for tightness
•
21. Adjusting the burner.......................................................................................................... 16
•
22. Instructing the system user.............................................................................................. 17
•
23. Operating and service documents................................................................................... 17
Commissioning, inspection, maintenance
Page
9