JVC HR-S5900AM Service Manual page 12

Hide thumbs Also See for HR-S5900AM:
Table of Contents

Advertisement

Procedures for Lowering the Cassette holder assembly
As the mechanism of this unit is integrated with the Housing
assembly, the holder must be lowered and the two screws un-
screwed when removing the Mechanism assembly.
(A)
(B)
Fig. 1
Turn the loading motor pulley in the direction as indicated by
Fig.2. As both (A) and (B) levers are lodged twice, push the
levers in the direction as indicated by Fig.3 to release them.
When pushing the levers, do it in the order of (A), (B), (B),
(A). When the holder has been lowered, turn the pulley until
the cassette holder is securely in place without allowing any
up/down movement.
Procedures for Lowering the Cassette holder assembly
(S1a)
(S1c)
Fig. D1
1-2
Fig. 2
Fig. 3
(S1b)
[1]
Top cover
(S1a)
(S1a)
(S1c)
[1]
Bracket
Front panel
back side
CN7108
(S2b)
WR2b
<Note 2c>
S Jack
board assembly
(L2a)
(L2b)
WR2b
<Note 2c>
[2]
WR2a
Front panel
<Note 2c>
CN7003
assembly
(S2a) ADV. Jog board
assembly
Fig. D2
Note: When installing the Drum assembly, secure the screws
(S3a to S3c) in the order of a, b, c.
Not used
Inertia plate
(S3c)
(S3a)
(L3a)
(P3)
(L3b)
Roller arm
assy
[3]
Drum
assembly
Fig. D3
CN916
CN7001
b <Note 2b>
a <Note 2a>
(L2a)
WR2a
<Note 2c>
Drum shield
(S3d)
WR3a
<Note 2c>
CON1
WR3b
(S3b)
<Note 2c>
Cleaner assy
(L3c)
CN1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hr-s5990amHr-s5990am/ea

Table of Contents