1. After plumbing and wiring are complete, close the
service valve to allow startup without pressurizing
the entire plumbing system. If a service valve was not
installed, close all fixtures in the home. Ensure the
bottom drain is closed.
2. Restore power to the Well-X1
breaker and electrical service switch (if installed). The
display will illuminate.
3. The display will read "88" to test the display illumination,
then a number identifying the control type (i.e. 07). This
number is for factory use and may vary by model and
manufacture date.
4. After a slight pause, the pump will start and the system
pressure will be displayed. This number will increase
as the pump runs and the tank fills.
Note: Some jet pumps may be difficult to prime,
resulting in the low water cut-off activating if pressure
will not build above 10 psig. Depressing the
will temporarily override the low water cut-off to allow
proper priming.
8. STARTUP & ADJUSTMENT
by turning on the
s
arrow
TO
SYSTEM
CLOSE
SERVICE
VALVE
9
FROM
WELL
DISPLAY