Weil-McLain 2 Series Manual page 46

Hide thumbs Also See for 2 Series:
Table of Contents

Advertisement

series
GV90+
DIRECT VENT —
Mount concentric termination
1. Mount the termination as shown in Figure 57, page 46.
2. Support the concentric vent/air termination at the roof pen-
etration as shown in Figure 57.
The supports/bracing used must support the termina-
tion assembly to prevent vertical slippage or sideways
movement.
The clamps used on the outside of the termination pipe
must not cut into the pipe or contain sharp edges that
could cause a crack to form.
The vent and air piping must be securely supported,
and must not rest its weight on the boiler fittings.
DO NOT drill or screw into either the vent pipe
or air pipe. Failure to properly support the vent
and air piping could result in vent piping damage,
resulting in possible severe personal injury, death
or substantial property damage.
When inserting the partially-assembled termina-
tion kit through the roof penetration, wrap plastic
or other protection over the end of the exposed
assembly to prevent debris from entering the pipes.
If the air passages become blocked, the boiler will
not operate. Once the rain cap has been cemented
to the assembly, there is no way to correct the prob-
lem. The assembly would have to be replaced if it
were cut to be removed and cleaned. Altering the
assembly in any way could result in severe personal
injury or death due to toxic flue product emissions.
When using AL294C stainless vent pipe, use the
vent pipe manufacturer's pipe adapter when con-
necting to the concentric vent attachment.
Do not connect any other appliance to the vent pipe
or multiple boilers to a common vent pipe.
3. After the assembly has been positioned in the roof opening
and all supports have been attached, install a bird screen
(purchased separately if not included with the kit) and rain
cap as follows:
a. Place the bird screen on the end of the inner pipe as in
Figure 58, page 47.
b. Cement the rain cap in place.
46
gas-fired water boiler – boiler manual
2
Vertical with 3" concentric
Vertical termination — 3" PVC concentric —
Figure 56
single or multiple boilers
Figure 57
3" PVC concentric termination supports
(continued)
Part number 550-143-010/1021

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gv90+Gv90+3Gv90+4Gv90+5Gv90+6Gv90 plus

Table of Contents