pressures to the operating pressure curve in the
Service Facts.
3. Check system subcooling. Follow the instruction listed
on the subcooling charging curve in the Service Facts.
4. Repeat
Step 1
through
circuit.
5. To stop the SERVICE TEST, turn the main power
disconnect switch to the "Off" position or proceed to
the next component start-up procedure. Remove
electro mechanical test mode connections (if
applicable).

Heating Start-Up

Using the Service Test Guide perform the proper test mode
connections.
When starting the unit for the first time or servicing the
heaters, it is a good practice to start the heater with the
main gas supply turned "Off". Once the ignition system and
components have been checked, open the main power
disconnect switch to reset the unit.

Final System Set Up

After completing all of the pre-start and start-up
procedures outlined in the previous sections (i.e.,
operating the unit in each of its modes through all
available stages of cooling and heating), perform these
final checks before leaving the unit:
Program the Night Setback (NSB) panel (if applicable)
for proper unoccupied operation. Refer to the
programming instructions for the specific panel.
Verify that the Remote panel "System" selection
switch, "Fan" selection switch, and "Zone
Temperature" settings for automatic operation are
correct.
Inspect the unit for misplaced tools, hardware, and
debris.
Verify that all exterior panels including the control
panel doors and condenser grilles are secured in place.
Close the main disconnect switch or circuit protector
switch that provides the supply power to the unit's
terminal block or the unit mounted disconnect switch.
RT-SVX058D-EN
Step 3
for each refrigerant
Start Up
27