Ocb Self Power Supply Test - Samsung QN55Q75CNF Service Manual

Qled tv
Hide thumbs Also See for QN55Q75CNF:
Table of Contents

Advertisement

4. Troubleshooting

4-6-2. OCB Self Power Supply Test

1.
Remove AC Power to the OCB & Remove Cover (follow Disassembly Procedure)
2.
Connect Discharge Tool across leads of each large Capacitors to remove its charge.
3.
Remove Connector CNM803 (to activate OCB Power Supply when AC line is applied)
4.
Connect TV Backlight Test Cable.
A13V
for 12.8Vdc on pins 7,8,9,10 at on test cable at OCB connector
9
IMPORTANT: For Safety NEVER Test CNM803 exposed connector pins without test cable connected.
B350
for approx 346Vdc at pins 15 & 16 is activated.
9
while using important B-GND reference at pins 19 & 20
If missing or errors, replace OCB Power Supply
IF TEST CABLE IS NOT AVAILABLE
1.
Perform steps 1 through 3
A13V
for 12.8Vdc at board locations Labeled A11.8V and AGND
9
B350
for approx 346Vdc at board test wire locations Labeled B332V and BGND
9
4-18

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Qn65q75cnf

Table of Contents