Carrier F96CTN Installation, Start-Up, Operating, Service And Maintenance Instructions page 43

Two-stage, variable-speed, multipoise 35 in. (889 mm) tall, condensing gas furnace
Table of Contents

Advertisement

F96CTN and G96CTN (Series A): Installation, Start-up, Operating, Service and Maintenance Instructions
Avoid short horizontal offsets with 90
deg. Elbows. Short offsets can be
difficult to slope and may trap con-
densate.
7
1
3
2
&
5
UPFLOW LEFT CONFIGURATION
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Use 45 deg. Elbows where
possible, to ensure conden-
sate drainage.
Fig. 52 – Near Furnace Vent Connections
Fig. 53 – Inducer Vent Elbow
6
Any other unused
knockout may be used
for combustion air
connection.
Rotate vent elbow to
4
5
required position.
A11309A
Any other unused
knockout may be used
for combustion air
connection.
Rotate vent elbow to
required position.
UPFLOW RIGHT CONFIGURATION
43
Slope vent pipe back to the
furnace at least ¼" per foot
7
6
2
5
1
3
4
5
A14546
A170006
A11308A

Advertisement

Table of Contents
loading

This manual is also suitable for:

G96ctn

Table of Contents