Superior Fireplaces WCT4920WS Installation And Operation Instruction Manual page 23

Table of Contents

Advertisement

ELBOW INSTALLATION
1. IHP provides a 15
(SPSE15) and 30
°
chimneys to avoid framing members or roof peaks. A maximum
of 30
from the vertical is allowed, and a total of four elbows (two
°
pair) for each chimney installation. Maintain 2" clearance to com-
bustibles.
2. Attach the elbow(s) to the chimney pipe or other support part and
push to lock. Using the offset chart, add chimney sections between
the elbows. A support band (SPSB) is required at the upper elbow
of the pair to support the load, as shown in Figure 30. Attach the
upper elbow to bring the chimney back to vertical.
Offset combinations: see Table 5 and illustration, Figure 31.
NAIL
SUPPORT BAND
(CAT. NO. SPSB)
4' MAX.
4' MAX.
FIRESTOP
Figure 30
L944 FIG18
6" DIAMETER CENTER LINE OFFSET TABLE
A
15° Angle
Length
No. Pcs.
B
0
0
18-7/16"
6"
1
22-13/16"
12"
1
28-5/8"
18"
1
34-3/8"
24"
1
40-3/16"
30"
2
44-1/2"
36"
1
51-3/4"
42
2
56-1/8"
48"*
1
63-3/8"
54"*
2
67-3/4"
60"*
2
73-1/2"
66"*
2
79-11/16"
72"*
2
85-1/2"
78"*
3
89-7/16"
84"*
2
96-11/16"
90"*
3
102-3/8"
96"*
2
108-1/4"
Table 5
(SPSE30) Elbow to allow
°
NAIL
A
C
Figure 31
30° Angle
L944 FIG17
C
B
C
2-1/4"
20-3/16"
5"
3-3/8"
24-1/16"
7-1/4"
4-15/16"
29-1/4"
10-1/4"
6-1/2"
34-7/16"
13-1/4"
8-1/16"
39-5/8"
16-1/4"
9-1/4"
43-1/2"
18-1/2"
11-3/16"
50-1/16"
22-1/4"
12-3/8"
53-15/16"
24-1/2"
14-1/4"
60-7/16"
28-1/4"
15-7/16"
64-3/8"
30-1/2"
17"
69-1/2"
33-1/2"
18-1/2"
74-3/4"
36-1/2"
20-1/16"
79-15/16"
39-1/2"
21-1/4"
83-13/16"
41-3/4"
23-3/16"
90-5/16"
45-1/2"
24-3/8"
94-3/16"
47-1/2"
26-5/16"
100-11/16"
51-1/2"
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
FLASHING INSTALLATION
1. Continue the SP chimney to the roof. Cut the roof opening, cen-
tered over the chimney. A 2 inch-airspace around the chimney is
required as it penetrates the roof. The size of hole in the roof will
vary depending on the roof pitch.
2. Install the next SP chimney section through the roof. See Figure 32.
NOTE: If your roof is already shingled, be sure to slide the upper edge
under the shingles to prevent leakage.
3. Install a bead of caulk around the pipe at the top edge of the flash-
ing. Wrap the storm collar around the pipe and imbed the edge in
the caulk to prevent leakage around the pipe.
4. Continue to install pipe sections until the proper termination height
is reached. See termination section.
B
Figure 32
DO NOT
OBSTRUCT OPEN-
ING IN FLASHING
Figure 33
AS SHOWN IN FIGURE 33 2" CLEARANCE
DIM. WILL VARY WITH ROOF PITCH
(Must maintain 2" clearance to combustibles)
2" CLEARANCE
CONTEMPORARY
CAP
(CAT. NO. SPC)
CAULK
STORM COLLAR
(CAT. NO SPSC)
FLASHING
(CAT. NO. SPF5) OR
GREATER DEPEND-
ING ON PITCH
23

Advertisement

Table of Contents
loading

Table of Contents