CONNECT THE MICROINVERTER


Connect the Q Cable to the microin-
verter. Listen for a click as the con-
nectors engage. (See Figure 6)

Cover any unused connectors with
Enphase Sealing Caps. Listen for a
click as the connectors engage.

You must lift the microinverter in
order to connect it. A protective
shield prevents connection.
CREATE AN INSTALLATION
MAP

The Installation Map is a diagram of
the physical location of each Mod-
ule in your PV installation.

Copy or use the blank map (See
Figure 8 and 9) to record the Mod-
ule placement for the system, or
provide your own layout if you re-
quire a larger or more intricate in-
stallation map.
Backside of
Figure 6. Connect the Q Cable to the microinverter

Each PV Module and Enphase IQ
Envoy has a removable serial num-
ber label. Build the installation map
by peeling the serial number labels
from the Modules and placing the
labels on the map. See Figure 7.

After you have created the installa-
tion map, use the Enphase Installer
Toolkit mobile app to record the
serial numbers and configure the
system.

For Installer Toolkit details, refer to
"Detecting Microinverters" in the
help topics of the Installer Toolkit
app.
(150) or (215)
module
Q cable
A protective shield
ACM label
Figure 7. ACM label on the module frame
9

Peel the removable serial number
label from each Module frame and
affix it to the respective location on
the installation map paper.

Always keep a copy of the installa-
tion map for your records.