B
A
B
2 Connect the low voltage wiring as follows:
A
B
A
B
3 Connect the high voltage wiring as follows:
A
1
High voltage Smart Grid contact 1
2
High voltage Smart Grid contact 2
EBVZ16S18+23DJ
Daikin Altherma 3 R F
4P643601-1B – 2021.10
b
b
K1A
K2A
1 2 3 4
a
X10M
5 6 9 10
X5M
X5M
X5M.4
S4S
X5M.3
3 4
1314
X5M
X10M.1
L
1
X10M.2
N
X10M.3
L
2
X10M.4
N
B
A
B
4 Fix the cables with cable ties to the cable tie mountings. If
necessary, bundle excessive cable length with a cable tie.
6.4
To install the mounting plate
Before you can install the demand PCB or digital I/O PCB, you have
to install the mounting plate as follows:
1×
a
a
Mounting plate + screw (delivered as accessory)
b
For demand PCB (A8P: EKRP1AHTA)
c
For digital I/O PCB (A4P: EKRP1HBAA)
6.5
After connecting the electrical
wiring to the indoor unit
To prevent water ingress to the switch box, seal the low voltage
wiring intake using the sealing tape (delivered as accessory).
Without low voltage cables
7
Configuration
INFORMATION
Cooling is only applicable in case a conversion kit
(EKHVCONV*) is installed.
7.1
Overview: Configuration
This chapter describes what you have to do and know to configure
the system after it is installed.
7 Configuration
X10M
1 2 3 4
b
c
With low voltage cables
Installation manual
27