Setting Equipment - Lennox ELITE Series Installation Instructions Manual

Gas furnace downflow air discharge
Table of Contents

Advertisement

EQUIPMENT IN CONFINED SPACE - ALL AIR FROM OUTSIDE
(All Air Through Ventilated Attic)
ROOF TERMINATED
EXHAUST PIPE
OUTLET
AIR
SIDE WALL
FURNACE
TERMINATED
EXHAUST PIPE
(ALTERNATE
LOCATION)
NOTE-The inlet and outlet air openings shall each have a free area of
at least one square inch per 4,000 Btu (645mm
of the total input rating of all equipment in the enclosure.
Figure 8
EQUIPMENT IN CONFINED SPACE -
ALL AIR FROM OUTSIDE
ROOF TERMINATED
EXHAUST PIPE
SIDE WALL
TERMINATED
EXHAUST PIPE
(ALTERNATE
LOCATION)
NOTE-Each air duct opening shall have a free area of at least one
square inch per 2,000 Btu (645mm
input rating of all equipment in the enclosure. If the equipment room
cate directly with the outdoors, each opening shall have a free area
of at least 1 square inch per 4,000 Btu (645mm
hour of the total input rating of all other equipment in the enclosure.
Figure 9
VENTILATION LOUVERS
(Each end of attic)
INLET AIR
(Ends 12" above
bottom)
2
per 1.17kW) per hour
OUTLET AIR
FURNACE
INLET AIR
2
per .59kW) per hour of the total
2
per 1.17kW) per
Shipping Bolt Removal
Units with 1/2 and 3/4 hp blower motor are equipped
with three flexible legs and one rigid leg. The rigid leg
is equipped with a shipping bolt and a flat white plastic
washer (rather than the rubber mounting grommet used
with a flexible mounting leg). See figure 10. The bolt and
washer must be removed before the furnace is placed
into operation. After the bolt and washer have been re-
moved, the rigid leg will not touch the blower housing.
Units with 1/2 or 3/4 HP Blower Motor
Installation - Setting Equipment
Do not install the furnace on its front, back or in the
horizontal position. See figure 12. Do not connect the
return air ducts to the back of the furnace. Doing so
will adversely affect the operation of the safety control
devices, which could result in personal injury or death.
Select a location that allows for the required clearances
that are listed on the unit nameplate. Also consider gas
supply connections, electrical supply, vent connection,
condensate trap and drain connections, and installation
and service clearances [24 inches (610 mm) at unit front].
The unit must be level from side to side. Unit may be
positioned from level to 1/2" toward the front to aid in
draining. See figure 11.
Allow for clearances to combustible materials as indicated
on the unit nameplate. Minimum clearances for closet or
alcove installations are shown in figure 13.
Page 8
RIGID LEG
remove shipping bolt and washe
Figure 10
WARNING

Advertisement

Table of Contents
loading

Table of Contents