4.3
Unpacking the product
1.
Remove the product from its box.
2.
Remove the protective film from all of the product's
components.
4.4
Checking the scope of delivery
7
6
5
4
3
2
1
▶
Check that the scope of delivery is complete.
Refer-
Quant-
Designation
ence
ity
point
1
1
Enclosed documentation
2
1
Tundish with retainer
3
1
2-port motorised valve
4
1
Safety group
5
1
Expansion vessel
6
1
Bag with accessories
7
1
Domestic hot water cylinder and temper-
ature and pressure relief valve
0020221298_04 auroSTOR Installation and maintenance instructions
4.5
Product dimensions
A
B
C
D
E
F
Dimensions (mm)
VIH S GB
VIH S GB
200/3 BES
250/3 BES
A
1,265
1,535
B
940
1,210
C
890
1,090
D
764
E
702
F
650
5
Installation
5.1
Setting up the unit horizontally
▶
Align the product vertically by adjusting the adjustable
feet.
5.2
Hydraulic connection
Caution.
Risk of damage caused by heat transfer
when welding.
The heat that is transferred during welding
may damage the cylinder and its components
as well as the connection seals.
▶
Protect the product and its components.
▶
Do not weld the connection pieces if these
have been screwed into the pipe fittings.
Installation 5
VIH S GB
300/3 BES
1,745
1,421
1,271
914
995
852
933
800
881
7