Section 3 Operation; Generator Control And Operation; Grounding The Generator; Generator Ac Neutral Connections - Generac Power Systems 0065791 Owner's Manual

Stationary industrial generators, standalone gas
Table of Contents

Advertisement

Operation
Section 3
3.1 — Generator Control and Operation
The operation of this generator set should only be performed by an "Authorized Operator," that is, someone who has
been properly trained by an Authorized Service Dealer. Contact your local Authorized Service Dealer for assistance in
training Authorized Operators.
The following instructions assume that the generator has been properly installed, serviced, tested, adjusted, and other-
wise prepared for use by a competent, qualified installation contractor and Authorized Service Dealer. Carefully read
the Safety Rules and any other safety information before attempting to operate this (and related) equipment.
3.1.1— Grounding the Generator
Ground the generator set in accordance with all codes and regulatory requirements.
$
DO NOT connect the ground wire to any pipe that carries a flammable or explosive substance as FIRE
or EXPLOSION may result.
3.1.2— Generator AC Neutral Connections
Grounding is recommended only at one point in the system. Consult local building codes for proper neutral grounding
requirements.
3.1.3— Initial Startup
The initial startup of the generator set must be performed and documented by an Authorized Service Dealer.
Owner's Manual for Stationary Industrial Generators
Grounding Electrode
Terminal
Figure 3-1. Grounding Electrode Terminal (Typical)
Base Frame