Advertisement

Unit Weight and Rigging
Figure 38. Rigging (continued)
SPREADER BARS
LENGTH
WIDTH
SPREADER BARS
LENGTH
WIDTH
SPREADER BARS
LENGTH
WIDTH
Before proceeding, refer to tables in Unit Weight section
for typical unit operating weights and
rigging drawing.
36
1. Remove the shipping crate from around the unit.
2. Rig the unit as shown in
4-point lift
Model: OAK
and OAN
3. Install a lifting bar, as shown in
4. Test-lift the unit to ensure it is properly rigged and
LIFTING POINTS
(4 LOCATIONS)
5. Lift the unit and position it into place. Remove fork
DETAIL C
SCALE 1 : 12
6. Downflow units; align the base rail of the unit with the
6-point lift
Model: OAK
and OAN
LIFTING POINTS
(6 LOCATIONS)
DETAIL A
SCALE 1 : 12
8-point lift
Model: OAK
and OAN
LIFTING POINTS
(8 LOCATIONS)
DETAIL A
SCALE 1 : 12
Figure 38, p. 35
for
Figure 38, p.
adequate strength lifting slings to all four lifting
brackets in the unit base rail. Do not use cables, chains,
or slings except as shown.
protect the unit and to facilitate a uniform lift. The
minimum distance between the lifting hook and the
top of the unit should be 7 feet.
balanced, make any necessary rigging adjustments.
pockets prior to setting on the curb.
curb rail while lowering the unit onto the curb. Make
sure that the gasket on the curb is not damaged while
positioning the unit.
35. Attach
Figure 38, p.
35, to
OAU-SVX004D-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon oage/fHorizon oake/fHorizon oane/f

Table of Contents