6 Installation
What
Completely recharging refrigerant Example:
Charging additional refrigerant
Before charging additional refrigerant, make sure the outdoor unit's
external refrigerant piping is checked (leak test, vacuum drying).
INFORMATION
Depending on the units and/or the installation conditions, it
might be necessary to connect electrical wiring before you
can charge refrigerant.
Typical workflow – Charging additional refrigerant typically consists
of the following stages:
1 Determining if and how much you have to charge additionally.
2 If necessary, charging additional refrigerant.
3 Filling in the fluorinated greenhouse gases label, and fixing it to
the inside of the outdoor unit.
Completely recharging refrigerant
Before completely recharging refrigerant, make sure the following is
done:
1 All refrigerant is recovered from the system.
2 The outdoor unit's external refrigerant piping is checked (leak
test, vacuum drying).
3 Vacuum drying on the outdoor unit's internal refrigerant piping is
performed.
NOTICE
Before completely recharging, perform vacuum drying on
the outdoor unit's internal refrigerant piping as well.
NOTICE
To perform vacuum drying or a complete recharge of the
outdoor unit's internal refrigerant piping it is necessary to
activate the vacuum mode (see
vacuum mode field setting" 
required valves in the refrigerant circuit so the vacuuming
process or recharge of refrigerant can be done properly.
▪ Before vacuum drying or recharging, activate field
setting "vacuum mode".
▪ After finishing vacuum drying or recharging, deactivate
field setting "vacuum mode".
WARNING
Some sections of the refrigerant circuit may be isolated
from other sections caused by components with specific
functions (e.g. valves). The refrigerant circuit therefore
features additional service ports for vacuuming, pressure
relief or pressurizing the circuit.
In case it is required to perform brazing on the unit, ensure
that there is no pressure remaining inside the unit. Internal
pressures need to be released with ALL the service ports
indicated on the figures below opened. The location is
depending on model type.
Location of service ports:
Installer reference guide
20
When
▪ When relocating the system.
▪ After a leak.
"To activate/deactivate the
[ 4   22]) which will open
b
a
Internal service port
b
Stop valve with service port (liquid)
c
Stop valve with service port (gas)
Typical workflow – Completely recharging refrigerant typically
consists of the following stages:
1 Determining how much refrigerant to charge.
2 Charging refrigerant.
3 Filling in the fluorinated greenhouse gases label, and fixing it to
the inside of the outdoor unit.
6.7.2

About the refrigerant

This product contains fluorinated greenhouse gases. Do NOT vent
gases into the atmosphere.
Refrigerant type: R32
Global warming potential (GWP) value: 675
WARNING: FLAMMABLE MATERIAL
The refrigerant inside this unit is mildly flammable.
WARNING
The appliance shall be stored in a room without
continuously operating ignition sources (example: open
flames, an operating gas appliance or an operating electric
heater).
WARNING
▪ Do NOT pierce or burn refrigerant cycle parts.
▪ Do NOT use cleaning materials or means to accelerate
the defrosting process other than those recommended
by the manufacturer.
▪ Be aware that the refrigerant inside the system is
odourless.
a
c
RZA200+250D7Y1B
Sky Air Advance-series
4P573383-1 – 2019.04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky air advance rza200d7y1bSky air advance rza250d7y1b

Table of Contents