12.8

Gas boiler system commissioning checklist

This Commissioning checklist is to be completed in full by the competent person who commissioned the appliance as a means of demonstrating compliance
with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This
does not affect the customer's statutory rights.
Customer name:
Address:
Boiler make and model
Boiler serial number:
Commissioned by (PRINT NAME):
Company name:
Company address:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
Building Regulations Notification Number (if applicable):
Controls: Tick the appropriate boxes
Time and temperature control to heating
Time and temperature control hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator valves
Automatic by-pass valve fitted to system
Boiler interlock
All Systems
The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer's instructions
What system cleaner was used?
What inhibitor was used?
Has a primary water system filter been installed?
The condensate drain has been installed in accordance with the manufacturer's instructions and/or BS5546/BS6798
CENTRAL HEATING MODE measure and record
Gas rate
Burner operating pressure (if applicable)
Central heating temperatures
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
If yes, and if required by the manufacturer, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
HOT WATER MODE measure and record
Gas rate
Burner operating pressure (if applicable)
Cold water inlet temperature
Hot water has been checked at all outlets
Water flow rate
All INSTALLATIONS - Record the following:
Pass 
Flue integrity check:
Fail
The heating and hot water system complies with the appropriate Building Regulations
The boiler and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the boiler and system controls have been demonstrated to and understood by the customer
The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through
a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
www.centralheating.co.uk
Greenstar 8000 Life – 6720883865 (2019/02)
Room thermostat and programmer/timer 
Load/Weather compensation 
Cylinder thermostat and programmer/timer 
Flow temperature
At max. rate:
CO
At max. rate: (where possible)
CO
Telephone number:
Gas Safe register number:
Telephone number:
Commissioning date:
Fitted 
Fitted 
Fitted 
Fitted 
3
m
/hr
mbar
OR Gas inlet pressure
°C
Return temperature
3
m
/hr
mbar
OR Gas inlet pressure
Yes 
ppm
AND
CO/CO
ppm
AND
CO/CO
Technical Specifications/Logs
Programmable room thermostat
Optimum start control
Combination boiler
Not required
Not required 
Not required 
Not required 
Provided 
Yes 
Quantity
litres
Yes 
No 
Yes 
OR
ft
mbar
Yes 
No 
Yes 
No 
OR
ft
mbar
Temperature
l/min
Ratio
2
Ratio
2
Yes 
Yes 
Yes 
Yes 
73
3
/hr
°C
3
/hr
°C
°C