Mercury 40 CT Maintenance And Installation Manual page 111

Table of Contents

Advertisement

c. Make a center mark ("c"), midway between marks ("a" and "b"). Align
the cable end guide with this center mark when installing cable to the
engine.
2. Manually shift the outboard into neutral. The propeller will rotate freely.
3. Position the remote control handle into neutral.
4. Fit the shift cable through the rubber grommet.
a
5. Attach the shift cable to the shift lever with a bow tie clip retainer.
eng
INSTALLATION
a
b
c
N
a -
Rubber grommet
b -
Shift cable
b
28489
101
6098
26838

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

60 ct40 seapro60 seapro

Table of Contents